Kerry
Member of the Trade: Eksonic
- Joined
- Feb 23, 2008
- Posts
- 206
- Likes
- 322
Quote:
My wife is already getting suspicious - I've got about 2 - 3 weeks of build time before she reaches her limit. That's where my current rig helps
I think I need to take my time on this one. It's got higher voltages than the GES.
I may do something different with the power supply (soft start vs. delay and relay on the HT). I'm just about done with the BOM and then ordering / waiting will take a bit of time. I'm going to layout / etch my own boards too. All together I think I'm looking at about two+ months.
If all goes well, it should be done and broken in by the Fall meet.
Originally Posted by immtbiker /img/forum/go_quote.gif OK, but I will need to see your ID while we sample the libations. Hi Kerry. Just do it like you did the GES. Have it sprawled out all over your dining room table for weeks before the meet and then finish it on the way over while you're driving to the meet. |
My wife is already getting suspicious - I've got about 2 - 3 weeks of build time before she reaches her limit. That's where my current rig helps
I think I need to take my time on this one. It's got higher voltages than the GES.
I may do something different with the power supply (soft start vs. delay and relay on the HT). I'm just about done with the BOM and then ordering / waiting will take a bit of time. I'm going to layout / etch my own boards too. All together I think I'm looking at about two+ months.
If all goes well, it should be done and broken in by the Fall meet.