LH Labs Geek Out v2+ Discussion Thread

Oct 16, 2015 at 5:11 AM Post #436 of 2,040
Very frustrating to have the guys creating a best and not able to get it........I got a ibasso D14 yesterday and this thing is so big !! The geekout V2 and V2+ are just amazing when you see how much power they managed to put in a such slim case
 
Oct 18, 2015 at 2:47 PM Post #439 of 2,040
Oct 18, 2015 at 5:16 PM Post #440 of 2,040
He he he.... your humor consoles me...
 
Oct 19, 2015 at 12:15 PM Post #441 of 2,040
Can't help but notice that the Wave isn't on that list...

Haha, you're right! I honed in on the incomplete Vi DAC PCB, which means some serious delays are still in order there. I didn't even clue in to the total lack of Wave info. Then again, none of the non-DAC component info is listed. Still, I dodged a bullet there. Luckily they went totally off base with the Wave campaign right before I pulled the trigger. I guess their scrambling saved my wallet. Then the continued scrambled sort of shot out the V2+, nice again :-)
 
One thing I worry about the chassis updating is that they'll go with too much aluminum. My GO 1000 *was* a space heater. It got so hot I couldn't touch it. Now it doesn't work after 1 year of normal use. I figure it fried itself. Since the V2+ has similar power output and thus draw, I hope they've found a way to somehow combat the heat, improve component longevity, and make a nice (not sh!tty plastic) case.
 
Super pumped to find out as the sonic feedback continues to be stellar.
 
Oct 19, 2015 at 4:09 PM Post #442 of 2,040
the production bar still says all V2+ shipped by October (presumably the end).
 
i'm flying east coast to phoenix and back at the end of October so I hope that happens.
 
Oct 19, 2015 at 4:11 PM Post #443 of 2,040
  the production bar still says all V2+ shipped by October (presumably the end).
 
i'm flying east coast to phoenix and back at the end of October so I hope that happens.

Might not want to hang your hat on those shipping estimates if you use history as a guide...
 
Oct 19, 2015 at 4:13 PM Post #444 of 2,040
  Might not want to hang your hat on those shipping estimates if you use history as a guide...

 
odds are good that i'll have to take my V2 out of the car system, and kluge up a Y OTG+power cable and Anker battery.......much messier
 
Oct 19, 2015 at 5:28 PM Post #445 of 2,040
  the production bar still says all V2+ shipped by October (presumably the end).
 
i'm flying east coast to phoenix and back at the end of October so I hope that happens.

 
Doubtful, when I raised a ticket they were estimating more like November and only October in the most optimistic scenario. Nothing about their history inspires optimism for me!
 
Oct 19, 2015 at 6:04 PM Post #446 of 2,040
  the production bar still says all V2+ shipped by October (presumably the end).
 
i'm flying east coast to phoenix and back at the end of October so I hope that happens.


December, or even January is a far safer bet. 
 
Oct 19, 2015 at 8:23 PM Post #448 of 2,040
There's a bit of a transition going on currently in LHL's outward facing roles, so we might encounter a little longer delay than usual in responses on such things...
 
Oct 19, 2015 at 11:48 PM Post #449 of 2,040
There is a new (brief) update on IGG;
 
"Dear Backers,
 
Just want you to know, we complete all the PCB board tests with your Geek Out V2+  and we are quite happy about the results. In next few days, Gavin will send the actually pictures of new Geek Out V2+ chassis. If every QC goes well, we will go full speed for chassis production and start shipping.
Stay tuned.
 
Larry"
 
Oct 20, 2015 at 12:05 AM Post #450 of 2,040
  There is a new (brief) update on IGG;
 
"Dear Backers,
 
Just want you to know, we complete all the PCB board tests with your Geek Out V2+  and we are quite happy about the results. In next few days, Gavin will send the actually pictures of new Geek Out V2+ chassis. If every QC goes well, we will go full speed for chassis production and start shipping.
Stay tuned.
 
Larry"

 
Excite!
 

Users who are viewing this thread

Back
Top