Is anyone building the KGSSHV?
Apr 26, 2012 at 6:12 AM Post #107 of 499
I have a working Power Supply, but my DMM shows some wierd readings after 10 seconds, slow drop in volts. It could be the DMM though. Reads 502v, then drops gradualy more and more, It now seems to be stabilizing at 398v.
 
Apr 26, 2012 at 6:58 AM Post #108 of 499
 
Quote:
I have a working Power Supply, but my DMM shows some wierd readings after 10 seconds, slow drop in volts. It could be the DMM though. Reads 502v, then drops gradualy more and more, It now seems to be stabilizing at 398v.

 
Over both - and +?
 
Apr 26, 2012 at 9:05 AM Post #113 of 499
 
Quote:
Buying power transformers locally is a big plus for me
smily_headphones1.gif
I imagine shipping cost for all the T2's transformers would be a chunk of money...

 
It sucked royal ass.
Compounded by having the b24 transformer and some dac stuff in the same shipment.
 
Apr 26, 2012 at 10:20 AM Post #114 of 499
Five transformers for the KGSSHV and two for the F5 in one shipment. Thankfully it came in 4 boxes. From SumR in Canada to Aus by slow boat.
 
Apr 26, 2012 at 10:59 AM Post #115 of 499
I refuse to wait for slow boat... the premium for the 3-5 day jobbie is like 50 bucks.
If it's a big order then it's worth it from a bald spot minimization point of view.
 
Apr 26, 2012 at 4:32 PM Post #117 of 499
 
Quote:
I refuse to wait for slow boat... the premium for the 3-5 day jobbie is like 50 bucks.
If it's a big order then it's worth it from a bald spot minimization point of view.

 
Well Richard was saying to me 3 weeks for Surface Mail, turned out to be 2 months. SumR need to understand there shipping ETA's a bit better, I also would have went with Air Mail had I known.
 

Users who are viewing this thread

Back
Top