post #2311 of 3967
Quote:
Originally Posted by justin w. View Post

Quote:
Originally Posted by Maxvla View Post

What a slow process. You'd think you could get a batch of aluminum and machine it in less than 16 weeks (3 1/2 months).

i could have aluminum in 3 days, machine it, get it polished and anodized, find out it looks like crap, and be out $10k, and have to start over after 3-4 months into it. for years that's what i did and i never had issues. its only in the past 1-2 years the quality has become a major problem

Although I'm very sure Justin would never do this, I think one way to build the GS-X and BHSE more quickly, would be for him to just build them any old how, without quality and anything resembling class. How many would sooner him do that ?
post #2312 of 3967

Getting highest grade materials or select batch quality, cherry picked or what ever you might call it from something that is produced on an industrial scale at industrial grade - like aluminum - most likely will a be a pain in the lower back area. This will be even more difficult when you are only ordering super low quantities. And on an industrial scale anything less than a full truckload is peanuts.

 

Pushing the limits and reaching for the top in any area, will make things in supply chain seriously difficult. Either it will take a lot of time due to being highly selective or prices will have to rise to a level that is simply prohibitive.

 

I prefer to wait until Justin has what he needs, in the quality he's willing to work with, rather than the latter.

post #2313 of 3967

a very large aluminum company made me a one-time offer; they would sell me their premium aluminum, but only the first bar that gets extruded from the billet, as this has the best quality for my application. They would then store the rest of the aluminum in their depot as standard grade material. This would require them making about 10,000lb for my 1,000lb order. It seemed they were interested in my application and were willing to attempt this even though i was 0.0001% of their sales. In the end i declined because it wasn't a long term solution

HeadAmp Audio Electronics - home of the Pico and Gilmore amps.  Now with Audeze, Fostex, HiFiMAN, Sennheiser, and STAX.
Find us at www.HeadAmp.com

Reply
post #2314 of 3967
Any updates justin? Must be getting close now for the current batch
post #2315 of 3967
Quote:
Originally Posted by justin w. View Post
 

 

[...] the end of the current batch being built, pending cancellations is mid-october. 

 

Reading back through the thread - hope Justin doesn't mean that the current batch being built (the 2013 batch) is due mid-october?

post #2316 of 3967
No, last October is when all orders for the current batch were filled.
post #2317 of 3967
Quote:
Originally Posted by aive View Post

Any updates justin? Must be getting close now for the current batch

 

if all goes well i'll have the first two (1 black, 1 red) completed by the end of the weekend. they are done now just have to laser engrave the black/red panels (today) and then do some final testing. still waiting on the silver panels

HeadAmp Audio Electronics - home of the Pico and Gilmore amps.  Now with Audeze, Fostex, HiFiMAN, Sennheiser, and STAX.
Find us at www.HeadAmp.com

Reply
post #2318 of 3967
Quote:
Originally Posted by justin w. View Post
 

 

if all goes well i'll have the first two (1 black, 1 red) completed by the end of the weekend. they are done now just have to laser engrave the black/red panels (today) and then do some final testing. still waiting on the silver panels

Hi Justin. Are they the 2013 batch, or the 2014 batch? Any estimate on my order placed last November?

post #2319 of 3967
Quote:
Originally Posted by justin w. View Post
 

 

if all goes well i'll have the first two (1 black, 1 red) completed by the end of the weekend. they are done now just have to laser engrave the black/red panels (today) and then do some final testing. still waiting on the silver panels

 

What about the rest?  I guess these will ship out before the BHSEs huh?

post #2320 of 3967
Quote:
Originally Posted by drexler007 View Post
 

Hi Justin. Are they the 2013 batch, or the 2014 batch? Any estimate on my order placed last November?


These for sure must be the 2013 batch. I am also in the 2014 ...

post #2321 of 3967
Great news - thanks for the update, Justin. I noticed you said on the BHSE forum that you wait for all the panels to come in before assembly and shipping. Is that still the case for the GS-X? That is, are you going to wait for the silver panels before finishing the black and red and the rest of the panels you have on hand?
post #2322 of 3967
Quote:
Originally Posted by tvolpe1600 View Post

Great news - thanks for the update, Justin. I noticed you said on the BHSE forum that you wait for all the panels to come in before assembly and shipping. Is that still the case for the GS-X? That is, are you going to wait for the silver panels before finishing the black and red and the rest of the panels you have on hand?

 

the GS-X silver panels are probably still 2 weeks out so i am starting the black and red now

HeadAmp Audio Electronics - home of the Pico and Gilmore amps.  Now with Audeze, Fostex, HiFiMAN, Sennheiser, and STAX.
Find us at www.HeadAmp.com

Reply
post #2323 of 3967
Very cool. Makes sense. Thanks!
post #2324 of 3967

here is the red one

 

HeadAmp Audio Electronics - home of the Pico and Gilmore amps.  Now with Audeze, Fostex, HiFiMAN, Sennheiser, and STAX.
Find us at www.HeadAmp.com

Reply
post #2325 of 3967

That is hot!