A detail of little importance:
At the PCB Rev 1.3 drawing, the labeling of C13P and C14P is swapped. According to the schematic, C13P is at the B+L (from Q4P to D1L) and C14P is at the B+R (from Q3P to D1R).
I am so bored waiting for the components and board that I am entertained tracking the layout at the picture. It is more fun than a Sudoku.
Not a matter of importance, since they have the same value, but it could be confusing in the case that you want to measure B+ for the Left Channel and put your tester into C13P. Then you will be measuring B+ for the Right Channel.
Edited by Pingfloid - 1/6/12 at 12:30am