Hi, I just finished building my m3 and I'm doing the initial setup right now. I'm following amb's excellent website.
It says I should measure R9G+ and by using BIAS(G) I should set it for 80 mV. I understand that, I'm just a little unsure about my meter, because when I measure across R9G+ the highest I can get is 7.9 with my meter set to the 200m scale/setting. Will this do? If I've made som huge blunder, please be gentle
This is my first real diy project (besides some cmoy's) and I'm not exactly all that great with electronics.
Thanks
It says I should measure R9G+ and by using BIAS(G) I should set it for 80 mV. I understand that, I'm just a little unsure about my meter, because when I measure across R9G+ the highest I can get is 7.9 with my meter set to the 200m scale/setting. Will this do? If I've made som huge blunder, please be gentle
This is my first real diy project (besides some cmoy's) and I'm not exactly all that great with electronics.Thanks








I'll post there too as soon as I can get my account activated.